NGEx Drills 7.59% Copper Over 10 Metres and 314.5 g/t Silver Over 12 Metres at Filo del Sol Project

VANCOUVER, BRITISH COLUMBIA–(Marketwired – April 30, 2014) – NGEx Resources Inc. (TSX:NGQ) (“NGEx” or the “Company”) is pleased to announce results from the final nine holes drilled during the 2014 drill program at the Filo del Sol copper-gold-silver project located in San Juan Province, Argentina. The drill holes announced today include infill holes which confirm the continuity of high-grade copper and silver mineralization and one step-out hole which extends the zone 300 metres to the north. Highlights include: